8 Core Fields
Reference number, description, standard, severity, date raised, responsible party, status, closure date. The minimum viable compliance record.
5 Register Sections
A: Design and Documentation · B: Construction Quality · C: Safety and Environment · D: Procurement and Contract · E: Donor and Regulatory
3 NCR Severity Levels
Major: immediate stop-work trigger. Minor: corrective action within 7 days. Observation: recorded for pattern monitoring. No action bypasses the register.
Step 1
Project Information
Fill in your project details. This information appears on all printed register exports.
Live Summary
Register Status Dashboard
0
Total Items
0
Compliant
0
Major NCR
0
Minor NCR
0
Open Items
Section A — Design and Documentation Compliance
| # | Ref No. | Requirement / Description | Standard Ref | Severity | Date Raised | Responsible Party | Status | Closure Date | Notes / Evidence |
|---|
Section B — Construction Quality Compliance
| # | Ref No. | Requirement / Description | Standard Ref | Severity | Date Raised | Responsible Party | Status | Closure Date | Notes / Evidence |
|---|
Section C — Safety, Health and Environment Compliance
| # | Ref No. | Requirement / Description | Standard Ref | Severity | Date Raised | Responsible Party | Status | Closure Date | Notes / Evidence |
|---|
Section D — Procurement and Contract Compliance
| # | Ref No. | Requirement / Description | Standard Ref | Severity | Date Raised | Responsible Party | Status | Closure Date | Notes / Evidence |
|---|
Section E — Donor and Regulatory Compliance
| # | Ref No. | Requirement / Description | Standard Ref | Severity | Date Raised | Responsible Party | Status | Closure Date | Notes / Evidence |
|---|
COS™ Ethics-First Principle
Every item in this register must be closed with verifiable evidence — not a declaration. A Major NCR is not closed until the corrective action has been physically inspected and documented. Compliance theatre produces paperwork that satisfies an authority but does not protect workers or assets. This register exists to protect people, not to produce reports.
COS™ Methodology — Compliance · Oversight · Sustainability